Stubbed out rebar awaiting first course of blockTwo walls with window v-buck installedAssembling window v-buck Pouring walls, stitching above windowsOutside 90's braced, window v-buck installed and braced Partially stacked wall braced to the interiorWalls at 9' with window v-buck installedHilti drilling for tapcons to secure bracing Wall section with bracing installed Pouring walls, stitching above windows Top plate installed with anchor bolts set in concreteTop plate installed with 3 different wall elevationsAnother picture with the top plate being attachedFront of home walls at 9', 10' & 12' at entery Finished ProjectFinished ProjectFinished ProjectFinished ProjectFinished Project
Project
Copyright © 2009     Mission Wall Systems     All Rights Reserved.     Site Design by Custom Web Sites
click on photos to enlarge